EGINA FPSO

 

OWNER:                               Ministry of Petroleum Resources, Nigeria

CLIENT:                                 Total Upstream Nigeria (TUPNI), NNPC, CNOOC

SCOPE:                                                 Engineering Support Service by SHI-I

FIELD LOCATION:             OML 130 Asset, 200km from Nigerian coast

SPECIFICATIONS

§  Water Depth:- 1550 m

§  Design Life: 25 years

§  Oil Production: 208,000 bpd

§   Gas Handling: 5.6 MMSCMD

 

§  Water Injection: 456,000 bpd